Valley News Dispatch

Saving the Salina Bridge to be costly project

Mary Ann Thomas
By Mary Ann Thomas
2 Min Read April 27, 2018 | 8 years Ago
Go Ad-Free today

More than 100 area residents showed Thursday at the Bell Township Volunteer Fire Department Recreation Hall to learn about the fate of the Salina Bridge.

PennDOT presented three options, costing roughly $11 million to $22 million, to rehabilitate the bridge spanning the Kiski River between Bell and Kiski townships.

The meeting was held to outline the options for the century-old span, which is eligible for a listing on the National Register of Historic Places.

Built in 1906, the Salina Bridge is a Parker Truss bridge, a design used for long spans from the mid-1800s through the early 1900s.

It was last rehabilitated in 1978.

The bridge serves just over 600 cars a day, according to PennDOT.

The span is structurally deficient and cannot carry water pumper fire trucks, which has been an issue for firefighters responding to local emergencies.

Although the bridge's steel is degrading and it's narrow by today's standards, the bridge still is safe for light traffic, according to Troy Pritts, design project manager for PennDOT district 12.

The bridge is woefully shy of current transportation standards — not even 19 feet wide. The minimum width for the bridge should be 28 foot, according to Pritts.

PennDOT will analyze the public's comments and project information and select an alternative and start design work in 2020. Construction could start in 2022, according to Pritts.

Mary Ann Thomas is a Tribune-Review staff writer. Reach her at 724-226-4691, mthomas@tribweb.com or via Twitter @MaThomas_Trib.

Share

About the Writers

Mary Ann Thomas is a Tribune-Review staff reporter. You can contact Mary at 724-226-4691, mthomas@tribweb.com or via Twitter .

Article Details

Salina Bridge options

PennDOT says it has three options for dealing with the structurally deficient Salina Bridge
in Bell and Kiski townships:

• Keep the existing bridge to support
one lane of traffic and build a second span for the other lane of traffic. Estimated cost: $16.3 to
$16.8 million.

• Widen and rehabilitate the existing bridge. Estimated cost: $21 to $22 million.

• Replace the bridge. Estimated cost:
$11-$12 million.

Push Notifications

Get news alerts first, right in your browser.

Enable Notifications

Enjoy TribLIVE, Uninterrupted.

Support our journalism and get an ad-free experience on all your devices.

  • TribLIVE AdFree Monthly

    • Unlimited ad-free articles
    • Pay just $4.99 for your first month
  • TribLIVE AdFree Annually BEST VALUE

    • Unlimited ad-free articles
    • Billed annually, $49.99 for the first year
    • Save 50% on your first year
Get Ad-Free Access Now View other subscription options