TribLive Logo
| Back | Text Size:
https://archive.triblive.com/news/michael-baker-jr-to-prepare-design-plans-for-chicago-area/

Michael Baker Jr. to prepare design plans for Chicago area

Pittsburgh Tribune-Review
By Pittsburgh Tribune-Review
1 Min Read Feb. 9, 2012 | 14 years Ago
| Thursday, February 9, 2012 12:00 a.m.

Michael Baker Jr. Inc., part of engineering firm Michael Baker Corp. of Moon, was chosen to prepare design plans, specifications and permits for stream bank stabilization and flood risk reduction projects in the Chicago area.

The contract with the Metropolitan Water Reclamation District of Greater Chicago is valued at $1.7 million.


Copyright ©2026— Trib Total Media, LLC (TribLIVE.com)